Glove boxes and procedures

Project: To produce STEMA installations for the construction of a cementing unit, a stripping station and the transfer facilities for the STEL control room within the cementing building
Find out more about this project

SPHINX valve

Project: To limit excess pressure and depression and ensure non-flame propagation in the event of a fire, via the provision of a small Sphinx valve (1500 m3/h) for the HI 105 cell within the DIADEM building, located on the Marcoule site