SPECIAL MACHINES

CLIENT : COMEX NUCLÉAIRE (Pôle Technologies d’ONET SA) pour AXIMA

SPHINX valve

Project: To limit excess pressure and depression and ensure non-flame propagation in the event of a fire, via the provision of a small Sphinx valve (1500 m3/h) for the HI 105 cell within the DIADEM building, located on the Marcoule site

Aims and characteristics:

  • To carry out the project while respecting a specific timeline for welding, and positioning internal parts in correlation with the cut-off pressure, developed via feedback given during development, in collaboration with the CEA
  • To respect the overall project budget (€50 k) and lead times (5 months)
  • To assign a project engineer to ensure monitoring and documentation; a storekeeper/picker; a designer; a research office manager; a technical and production engineering manager; a qualified sheet metal worker; a qualified welder; a workshop manager; and a qualified fitter

CSTI Group services:

  • Sourcing
  • Production
  • Factory checks (dimensions, levelness, compliance with plans)
  • Tests and trials
  • Packaging and delivery