Project: To provide 4 sets of tools required for the use of TN 112 packaging within a nuclear power plant
Project: To provide 4 sets of tools required for the use of TN 112 packaging within a nuclear power plant
Project: To carry out renovation works to improve the installation’s safety levels and improve its durability, following the installation’s safety review concluded by the Laboratories and Factories Safety Commission on 20 October 2010
Project: To produce all assembly and maintenance equipment (AME) allowing for the installation and operation of 6 modules forming plasma diagnostic no 14 within the experiment chamber
Project: To supply metal drums for low and medium-level nuclear waste, for all Decommissioning-Waste Project Management (DP2D) decommissioned sites and the Activated Waste Packaging and Storage Facility (ICEDA) site, as part of the dismantling of first-generation power plants (Chooz, Brennilis, St-Laurent, Chinon, Bugey and Creys-Malville) and the management of the sites’ operational waste, currently stored in spent-fuel pools
Project: To study, supply and implement the equipment required for quantitative assessments, and to control the tritium degassing of 200 L drums, whether immobilised or not, in a dedicated « Package Control Installation » unit within the Aube Storage Centre
Project: To safely and securely take representative samples of the liquid solutions contained within the drums for subsequent analysis
Project: To produce a container processing unit on a “STAR post 2006” cutting bench, as part of a project for the evacuation of spent fuels, and to create equipment for the drilling and drying of fuel containers within LECA-STAR (INB 55 Building 316)
Project: To produce STEMA installations for the construction of a cementing unit, a stripping station and the transfer facilities for the STEL control room within the cementing building
Find out more about this project
Project: To limit excess pressure and depression and ensure non-flame propagation in the event of a fire, via the provision of a small Sphinx valve (1500 m3/h) for the HI 105 cell within the DIADEM building, located on the Marcoule site
Projet : Mettre en place dans le bâtiment du laser mégajoule (LMJ) du CEA CESTA une installation qui sera utilisée pour retirer à l’aide d’une solution chimique fortement basique le traitement anti-reflet présent en surface des composants optiques en silice