« Joggle tool + tilting tool » equipment
To design the « JOGGLE TOOL + TILTING TOOL » system to form conductors for the ends of the ITER poloidal-field coils (PF)
To design the « JOGGLE TOOL + TILTING TOOL » system to form conductors for the ends of the ITER poloidal-field coils (PF)
To produce the ASTRID combination-structure cuvette shafts model comprising four S355 steel modules, providing a simplified representation of cuvette shafts as part of the development of combination structures
Project: To provide source centring tools to carry out the gamma-ray inspection of the 2 welds connecting the VGs to the intermediate rings of the primary pipes (all bearings)
Project: To create tools for 1300 MW and 900 MW pipe pressurisers for the Chinon non-destructive testing cell
Project: To supply two oil separators for the EDF BUGEY nuclear power plant and one oil separator for the EDF FESSENHEIM nuclear power plant
Project: To produce the containment chamber glove box as part of a project for the nuclearisation a hydraulic compaction press
Project: To provide 4 sets of tools required for the use of TN 112 packaging within a nuclear power plant
Project: To carry out renovation works to improve the installation’s safety levels and improve its durability, following the installation’s safety review concluded by the Laboratories and Factories Safety Commission on 20 October 2010
Project: To produce all assembly and maintenance equipment (AME) allowing for the installation and operation of 6 modules forming plasma diagnostic no 14 within the experiment chamber
Project: To supply metal drums for low and medium-level nuclear waste, for all Decommissioning-Waste Project Management (DP2D) decommissioned sites and the Activated Waste Packaging and Storage Facility (ICEDA) site, as part of the dismantling of first-generation power plants (Chooz, Brennilis, St-Laurent, Chinon, Bugey and Creys-Malville) and the management of the sites’ operational waste, currently stored in spent-fuel pools