GLOVE BOXES

CLIENT : GANIL (CEA/CNRS) – GRAND ACCÉLÉRATEUR NATIONAL D’IONS LOURDS

Portes blindées et boîtes à gants

Project: To fully carry out the manufacturing of 5 armoured doors, ensuring the radiological protection of all personnel and the environment

Aims and characteristics:

  • To create 5 armoured doors of different sizes and configurations, with masses and thicknesses varying from 20 to 60 tonnes and from 500 to 2000 mm
  • To install 2 glove boxes, 1 pivot door, 2 sliding doors, 2 stopper doors and 1 cart allowing the preparation and the transfer of targets on the GANIL site (Large Heavy Ion National Accelerator)
  • To integrate specific heavy-ion radiological protection into doors
  • To ensure the correct dimensions for earthquake resistance
  • To verify the specific characteristics of concrete pouring

CSTI Group services:

  • Mechanical, electrical and automation studies
  • Creation of the dimensioning justification calculation reports
  • To produce and supply the installation’s constituent components
  • Electrical connections
  • Regulatory tests and markings
  • Compliance with applicable standards and regulations, in particular the French quality decree of 10/08/1984, modified by the decree of 07/02/2012
  • Provision of full technical documentation
  • On-site delivery including transport and lifting equipment
  • Installation, connection, start-up and commissioning
  • Training of operating staff