GLOVE BOXES
CLIENT : GANIL (CEA/CNRS) – GRAND ACCÉLÉRATEUR NATIONAL D’IONS LOURDS
Portes blindées et boîtes à gants
Project: To fully carry out the manufacturing of 5 armoured doors, ensuring the radiological protection of all personnel and the environment
Aims and characteristics:
- To create 5 armoured doors of different sizes and configurations, with masses and thicknesses varying from 20 to 60 tonnes and from 500 to 2000 mm
- To install 2 glove boxes, 1 pivot door, 2 sliding doors, 2 stopper doors and 1 cart allowing the preparation and the transfer of targets on the GANIL site (Large Heavy Ion National Accelerator)
- To integrate specific heavy-ion radiological protection into doors
- To ensure the correct dimensions for earthquake resistance
- To verify the specific characteristics of concrete pouring
CSTI Group services:
- Mechanical, electrical and automation studies
- Creation of the dimensioning justification calculation reports
- To produce and supply the installation’s constituent components
- Electrical connections
- Regulatory tests and markings
- Compliance with applicable standards and regulations, in particular the French quality decree of 10/08/1984, modified by the decree of 07/02/2012
- Provision of full technical documentation
- On-site delivery including transport and lifting equipment
- Installation, connection, start-up and commissioning
- Training of operating staff